A processor finishes examining a satellite image at 10:02. A port planner needs the answer by 10:15 to assign an inspection crew. At 10:18 the answer arrives, perfectly intact. In a trial for that buyer, the run consumed energy and delivered zero timely decisions. Before comparing an orbital processor with a terrestrial one, agree on what the receiving team must be able to do, and by when.
What the SpaceX milestone establishes
The FCC’s February 2026 public notice describes SpaceX’s proposed optical links between orbital data centers, including possible connections to Starlink satellites. The Space Bureau’s November 25 order, DA 26-1273, granted the application in part with conditions and deferred part. Its scope of grant specifies radio communications for backup and emergency tracking, telemetry and command. Neither document supplies a measured energy cost for delivering a customer’s analysis. That takes a workload and a receipt at the other end.
Trace the same image through both routes
Give the orbital team and the ground team identical source images and the same accuracy requirement. One route runs inference near the sensor and transmits a compact answer. The other sends the image to a ground processor. Have the receiving application record the image identifier, result, time of arrival and whether the result passed the quality check. Keep every attempted image in the log, including images that produced no usable answer.
Draw the measurement boundary before the trial. On the spacecraft, account for electrical energy used to compute, retain and transmit the result, including retries and powered thermal-control equipment. Record temperature limits separately: a passive radiator has a heat-rejection constraint even when it draws no electrical power. Track solar input and changes in battery charge so that energy stored and later withdrawn does not appear twice. For the terrestrial route, include the image downlink, ground compute and cooling. If a relay or ground station gives you no meter data, mark its contribution as estimated and show how large it would have to be to reverse the ranking.
Give the candidate one late receipt
Suppose a fictional trial uses 120 watt-hours inside its stated boundary for ten jobs. Eight distinct results arrive on time and pass inspection. The observed cost is 15 watt-hours per accepted result. Dividing by ten would reward two jobs the buyer could not use. Repeat the trial with a missed relay window. Ask the engineer which data to keep for retransmission, when to retire a stale result and how the receiver recognizes a repeat. Report timely completions alongside energy per completion. A system that serves only the easiest images can otherwise look remarkably efficient.
Another perspective
A scientist building a long-lived archive may value a late image and need its original pixels for later analysis. Give that buyer a different acceptance test. The mission owner sets the delivery deadline and retention requirement before the trial. The engineering lead hands over the meter readings, receipt log and missing estimates so another team can reproduce the comparison when the mission changes.